Horje
typescript calculate days between dates Code Example
typescript calculate days between dates
let startDate: string = "2021-04-01";
let date1: Date = new Date();
let date2: Date = new Date(startDate);
let timeInMilisec: number = date1.getTime() - date2.getTime();
let daysBetweenDates: number = Math.ceil(timeInMilisec / (1000 * 60 * 60 * 24));




Typescript

Related
typescript check if string is number Code Example typescript check if string is number Code Example
vue\npm\vue.ps1 cannot be loaded because running scripts is disabled on this system Code Example vue\npm\vue.ps1 cannot be loaded because running scripts is disabled on this system Code Example
error: failed to synchronize all databases (unable to lock database) Code Example error: failed to synchronize all databases (unable to lock database) Code Example
error: failed to update core (unable to lock database) error: failed to update extra (unable to lock database) Code Example error: failed to update core (unable to lock database) error: failed to update extra (unable to lock database) Code Example
matplotlib subplots size Code Example matplotlib subplots size Code Example

Type:
Code Example
Category:
Coding
Sub Category:
Code Example
Uploaded by:
Admin
Views:
11